Bases reguladoras y convocatoria de la campaña “obsequia comercio local, tiene premio IV” para la dinamización del comercio de proximidad en 2026/27.
Awarded by: AYUNTAMIENTO DE A LARACHA
There are 553 open grants (or grants with a deadline to be confirmed) for the self-employed, businesses and associations. The 548 that publish a budget add up to €410,443,930 (according to the BDNS). Closing first: “Convocatoria otorgamiento ayudas economicas para el transporte adaptado y asistido a la comarca del bages”, on 16 November 2026.
Not sure where to start? Take the 60-second quiz
Awarded by: AYUNTAMIENTO DE A LARACHA
Awarded by: AYUNTAMIENTO DE ALCOY/ALCOI
Awarded by: AYUNTAMIENTO DE GALDAKAO
The period (3 días hábiles a partir del siguiente al de la publicación del extracto de la Convocatoria) starts when the call is published in the official gazette. Check the date in the gazette before applying.
Awarded by: AYUNTAMIENTO DE ALCÀSSER
Awarded by: AYUNTAMIENTO DE MEDINA DE LAS TORRES
The period (UN MES a partir del día siguiente a la publicación del extracto de esta convocatoria en el BOP) starts when the call is published in the official gazette. Check the date in the gazette before applying.
Awarded by: AYUNTAMIENTO DE LOJA
The period (Tras 20 días hábiles a contar desde el día siguiente a la publicación) starts when the call is published in the official gazette. Check the date in the gazette before applying.
Awarded by: AYUNTAMIENTO DE ALCALÁ DE HENARES
Awarded by: AYUNTAMIENTO DE ALCALÁ DE HENARES
Awarded by: DIRECCIÓN GENERAL DE DISCAPACIDAD
The period (20 días a partir del día siguiente al de la publicación en el DOCM) starts when the call is published in the official gazette. Check the date in the gazette before applying.
Awarded by: CENTRO DE INVESTIGACIONES SOCIOLÓGICAS
Awarded by: AYUNTAMIENTO DE PARACUELLOS DE JARAMA
The period (FINALIZADOS LOS 15 DÍAS HÁBILES DESDE LA PUBLICACION EN BOCM) starts when the call is published in the official gazette. Check the date in the gazette before applying.
Awarded by: CONSEJERÍA DE EMPLEO, EMPRESA Y TRABAJO AUTÓNOMO
Awarded by: AYUNTAMIENTO DE SANTANYÍ
Awarded by: AYUNTAMIENTO DE FUENTE ÁLAMO DE MURCIA
The period (15 días desde el día de la publicación en el BORM) starts when the call is published in the official gazette. Check the date in the gazette before applying.
Awarded by: AYUNTAMIENTO DE FUENTE ÁLAMO DE MURCIA
The period (15 días desde el día de la publicación en el BORM) starts when the call is published in the official gazette. Check the date in the gazette before applying.
Awarded by: AYUNTAMIENTO DE FUENTE ÁLAMO DE MURCIA
The period (15 días desde el día de la publicación en el BORM) starts when the call is published in the official gazette. Check the date in the gazette before applying.
Awarded by: AYUNTAMIENTO DE MOTILLA DEL PALANCAR
Awarded by: DIPUTACIÓN PROVINCIAL DE GRANADA
Awarded by: AYUNTAMIENTO DE ANDÚJAR
The period (DIEZ DÍAS TRAS PUBLICACIÓN EN BOP) starts when the call is published in the official gazette. Check the date in the gazette before applying.
Awarded by: AYUNTAMIENTO DE ALBORAIA/ALBORAYA